Trikom

Projects

Control cabinets for filtering Skids

Fifty control cabinets were built for different processes of five thermo-electric plants.

The blueprint was designed, the cabinets were built and the FAT tests were done with each cabinet.

For this project was used the Altivar 320 drive by Scheneider Electric, CFW500 drive by WEG and a M172 PLC by Schneider Electric.

  • Client: Flowar Argentina
  • Location: Buenos Aires, Argentina
  • Date: November 2019